Construction

Getting it built, inspected, and through the critical stage checkpoints.

The basics — free

  • Your certifier signs off critical-stage inspections during construction. Missing one is expensive to remedy after the fact.
  • Trade sequencing matters more than most owner-builders expect - the classic failure is trades arriving in the wrong order.
  • Utility connections (water, sewer, power) have their own lead times, separate from the build.

Working detail — locked

Pay once, it's yours

4 detailed points on this stage alone, plus every other stage, the cost calculator, and the sourced eligibility detail.

Where this stage costs people money

Booking trades in the wrong order - a framer arriving to an uncured slab, or plumbing rough-in after the slab is poured.