Granny Flat Companion

NSW secondary dwellings / granny flats

Find out if your lot qualifies
before you spend a dollar

A granny flat that hits every Housing SEPP standard can be approved by a registered certifier in about 20 days. Miss one standard and you're on the DA pathway — months longer, assessed on merit, and able to be refused. This tells you which one you're on, free.

Every threshold above is sourced from NSW Government pages — see the sources.

What it costs

Pay once. No subscription. A refused application or a wrong pathway choice costs thousands — this exists to prevent one of those.

Granny Flat Toolkit

AUD $97

one-time

Everything: the pathway and the plan, plus the compliance areas that actually get applications refused or blow out budgets.

  • Full stage-by-stage roadmap, site assessment through to occupation certificate
  • Cost breakdown with indicative NSW ranges and sources, and quote guidance where no public figure exists
  • Eligibility indicator with every threshold sourced
  • Setbacks and LEP floor-area variation pack
  • Fire separation pack (critical for attached secondary dwellings)
  • BASIX / NatHERS pack
  • Bushfire (BAL) pack
  • Common refusal reasons with plain-English fixes
  • Document checklist with the right portals and certifier links
  • Yours to keep - pay once, no subscription

Free · no signup

Kynric Trades Calculators

Buying the toolkit already? Grab the free concrete, framing and roofing calculators too — the same tools tradies use on site, handy for costing and planning your granny flat build.

Open the free calculators →

The five stages

Stage names and the shape of each one are free. The working detail — what to do in what order, and where people lose money — is the paid part.

  1. 01Site assessmentWork out what your lot will actually allow before you pay anyone to draw anything.
  2. 02Design rulesThe numeric limits your design has to hit, and the ones that vary by council.
  3. 03Approvals pathwayCDC or DA. This single choice drives your timeline, your cost, and your risk.
  4. 04ConstructionGetting it built, inspected, and through the critical stage checkpoints.
  5. 05Occupation certificateThe paperwork that turns a finished building into one you can legally occupy or rent.

Also from Kynric