Site assessment
Work out what your lot will actually allow before you pay anyone to draw anything.
The basics — free
- Confirm your lot area, width at the building line, and land-use zone - these three decide most of the pathway question on their own.
- Find out whether the land is bushfire-prone, flood-affected, or heritage-listed. Each one changes the pathway, the cost, or both.
- Check where your sewer, stormwater and easements run. A main under the only sensible build location is a very expensive surprise.
Working detail — locked
Pay once, it's yours
4 detailed points on this stage alone, plus every other stage, the cost calculator, and the sourced eligibility detail.
Where this stage costs people money
Commissioning design work before confirming the lot meets the minimum area and width. Design fees are not refundable because the lot was never eligible.